XI. PUBLIC SERVICES
Mitigation
The following mitigation measure would reduce the potential impact of road and sidewalk disruption from construction to a less-than-significant level.
Mitigation Measure XI.d-1: Following construction of the distribution feeder line and closure of the trench, PG&E shall restore the road surface in the trenched lanes along Winchester Boulevard and Lark Avenue and in the sidewalk to a condition equal to or better than that at the time immediately prior to initiating construction.