Fulton-Fitch Mountain Reconductoring Project

Application No. A.15-12-005

 

IS/MND Data Needs


Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your computer system, then browse to that folder and double-click the downloaded file to open it in Acrobat. Please note some documents may take a few minutes to load due to the large file sizes.

 

The CPUC submitted Data Needs requests to PG&E during the environmental review process to support the preparation of the IS/MND. Data Needs for the project and PG&E’s responses are summarized in the following table:


CPUC Data Needs
PG&E Response and Status
Data Needs #1
(June 9, 2016)
Response #1 (July 8, 2016)
Table of Responses #1
Summary of Project Emissions: Air Quality, Greenhouse Gas
Helicopter Emissions Calculations: Air Quality, Greenhouse Gas
SF6-Insulated Breaker Emissions: Greenhouse Gas
Construction Equipment List
Data Needs #2
(September 12, 2016)
Response #1 (October 12, 2016)
Table of Responses #1
Attachment: Control Building Draft Sketch
Attachment: Preliminary Construction Plan for PS-6
Attachment: Calculations and CalEEMod Files (TRC 2016)
Attachment: Maps from Addendum #2 to Biological Resources Technical Report (TRC 2016)
Attachment: Special-Status Plant Survey Memo (GANDA 2016)
Attachment: FAA Expired Determinations
Attachment: Updates to the Revised Wetland Delineation Report (TRC 2016)
Attachment: PG&E Windsor Substation Project Location Map

Response #2 (October 17, 2016)
Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) 
Data Needs #3
(October 31, 2016)
Response #1 (December 2, 2016)
Table of Responses #1

Response #2 (December 23, 2016)
Attachment: Updated GIS data (Confidential)

Response #3 (January 13, 2017)
Attachment: Addendum #3 to the Biological Resources Technical Report (TRC 2016)
Data Needs #4
(March 23, 2017)
Response #1 (April 6, 2017)
Table of Responses #1

Response #2 (April 11, 2017)
Attachment: Additional Cultural Resources Survey Report (Confidential)

Response #3 (May 30, 2017)
Attachment: GIS data for project elements, biological resources, cultural resources, and wetland and water resources (Confidential)

Response #4 (May 31, 2017)
Attachment: Biological Reconnaissance Survey for Work Areas (TRC 2017)
Attachment: Memo regarding SW3 at Pole 62 (TRC 2017)
Attachment: Memo regarding Aquatic Resources Assessment (GANDA 2017)



Website info

This page contains tables and is best viewed with Firefox or Internet Explorer.
Please report any problems to the Energy Division web coordinator .

   
   
 

Project Home Page - CPUC Environmental Information - CPUC Home - Top