|
|
|
STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
Pacific
Gas and Electric Company
Fulton-Fitch
Mountain Reconductoring
Project
Application No.
A.15-12-005
|
|
Files linked on this page are in Portable Document
Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader
if it is not already installed on your computer. For
best results in displaying the largest files (see sizes shown in
parentheses below for files larger than 3.0 MB), right-click the file's
link, click "Save Target As" to download the file to a folder on your
computer system, then browse to that folder and double-click the
downloaded
file to open it in Acrobat. Please note
some documents may take a few minutes to load due to the large file sizes.
|
|
The
CPUC is submitting Data Needs requests to PG&E as necessary to
support the preparation of the Supplemental IS/MND during the PFM 1
review process. Data Needs for PFM 1 and PG&E’s responses are
summarized in the following table:
CPUC Data Needs | PG&E Response | | Response #1 (September 17, 2018)Table of Responses #1Attachment: GIS for revised work areas, access roads, and facility locations (Confidential) | | | | | | | | *Data Needs #5 responses are included with the responses to Data Needs #6 | | |
|
|
|