Previous Code
Main Page
Original GO 165 Startup Page

Current GO 165 Startup Page

Change List for this Rule

Search GO 165

General Order 165
Table 1

Distribution Inspection Cycles (Maximum Intervals in Years)

 

 

Patrol

Detailed

Intrusive

Urban

Rural

Urban

Rural

Urban

Rural

Transformers

Overhead

1

21

5

5

---

---

Underground

1

2

3

3

---

---

Padmounted

1

2

5

5

---

---

Switching/Protective Devices

Overhead

1

21

5

5

---

---

Underground

1

2

3

3

---

---

Padmounted

1

2

5

5

---

---

Regulators/Capacitors

Overhead

1

21

5

5

---

---

Underground

1

2

3

3

---

---

Padmounted

1

2

5

5

---

---

 

Overhead Conductor and Cables

1

21

5

5

---

---

Streetlighting

1

2

x

x

---

---

Wood Poles under 15 years

1

2

x

x

---

---

Wood Poles over 15 years which have not been subject to intrusive inspection

1

2

x

x

10

10

Wood poles which passed intrusive inspection

---

---

---

---

20

20

 

(1)    Patrol inspections in rural areas shall be increased to once per year in Extreme and Very High Fire Threat Zones in the following counties: Imperial, Los Angeles, Orange, Riverside, Santa Barbara, San Bernardino, San Diego, and Ventura.  Extreme and Very High Fire Threat Zones are designated on the Fire and Resource Assessment Program (FRAP) Map prepared by the California Department of Forestry and Fire Protection’s Fire and Resource or the modified FRAP Map prepared by San Diego Gas & Electric Company (SDG&E) and adopted by Decision 12-01-032 in Phase 2 of Rulemaking 08-11-005.The fire threat map is to be used to establish approximate boundaries and Utilities should use their own expertise and judgment to determine if local conditions require them to adjust the boundaries of the map.

 

Note:    This General Order does not apply to cathodic protection systems associated with natural gas facilities.

 

Note:    For the purpose of implementing the patrol and detailed inspection intervals in Table 1 above, the term “year” is defined as 12 consecutive calendar months starting the first full calendar month after an inspection is performed, plus or minus two full calendar months, not to exceed the end of the calendar year in which the next inspection is due.