Original Version
Rule 44.1
44.1 | Installation and Reconstruction |
Lines and elements of lines, upon installation or reconstruction, shall provide as a minimum the safety factors specified in Table 4 for vertical loads and loads transverse to lines and for loads longitudinal to lines except where longitudinal loads are balanced or where there are changes in grade of construction (see Rules 47.3, 47.4 and 47.5). The design shall consider the structural loading and mechanical strength requirements of all supply and communication facilities planned to occupy the structure. For purposes of this rule, the term “planned” applies to the facilities intended to occupy the structure that are actually known to the constructing company at the time of design. |
Strikeout and Underline Version
Rule 44.1
44.1 | Installation and Reconstruction |
Lines and elements of lines, upon installation or reconstruction, shall provide as a minimum the safety factors specified in Table 4 for vertical loads and loads transverse to lines and for loads longitudinal to lines except where longitudinal loads are balanced or where there are changes in grade of construction (see Rules 47.3 , 47.4 and 47.5 ). The design shall consider the structural loading and mechanical strength requirements of all supply and communication facilities planned to occupy the structure. Table 4. The design shall consider all supply and communication facilities planned to occupy the structure. For purposes of this rule, the term “planned” applies to the facilities intended to occupy the structure that are actually known to the constructing company at the time of design. The entity responsible for performing the loading calculation(s) for an installation or reconstruction shall maintain records of these calculations for the service life of the pole or other structure for which the a loading calculation was made and shall provide such information to authorized joint use occupants and the Commission upon request. |
Final Version
Rule 44.1
44.1 | Installation and Reconstruction |
Lines and elements of lines, upon installation or reconstruction, shall provide as a minimum the safety factors specified in Table 4. The design shall consider all supply and communication facilities planned to occupy the structure. For purposes of this rule, the term “planned” applies to the facilities intended to occupy the structure that are actually known to the constructing company at the time of design. The entity responsible for performing the loading calculation(s) for an installation or reconstruction shall maintain records of these calculations for the service life of the pole or other structure for which the a loading calculation was made and shall provide such information to authorized joint use occupants and the Commission upon request. |