|  
             These files are in Portable Document Format (PDF). 
              To view them, you will need to download the free Adobe 
              Acrobat Reader if it is not already installed on your PC. 
              Note: For faster results in displaying the largest files 
              (files over 5.0MB are marked "large" below), right-click 
              the file's link, click "Save Target As" to download 
              the file to your hard drive, then double-click the downloaded file. 
            Except as noted with an asterisk (*), the following documents are 
              available at 28 libraries and offices 
              in the project area. 
              SDG&E Biological 
              Assessment (October 2008)* 
              USFWS Biological Opinion 
              (January 2009)* (large) 
              BLM Section 
              106 Programmatic Agreement letter* 
              Notices of Appeal 
              to the U.S. Department of Interior’s Office of Hearings & Appeals 
              at the Interior Board of Land Appeals:* 
                  Perkins 
              Coie LLP on behalf of Viejas Band of Kumeyaay Indians (March 23, 
              2009) 
                  Backcountry Against Dumps, 
              Protect Our Community Foundation, East County Community Action Coalition, 
              Donna Tisdale: Notice of 
              Appeal (March 23, 2009). Request 
              for a Stay (March 23, 2009)  
                  Katheryn 
              Rhodes and Conrad Hartsell, M.D. (March 11, 2009) 
              Notice of Availability 
              for the Recirculated Draft EIR/EIS (July 8, 2008) 
              Notice of Additional 
              Public Participation Hearings, postcard (April 2008) 
              Notice of Availability 
              for the Draft EIR/EIS (January 3, 2008) 
              Comment letters received on 
              the Modified Route D Alternative from mid-June to October 2007 
              Comment letters received in 
              response to the May 16, 2007 Notice on the Modified Route D 
              Alternative* 
              CPUC/BLM Notice Regarding 
              an Additional EIR/EIS Alternative to the Proposed Sunrise Powerlink 
              Project (May 16, 2007) 
              Scoping Report, Part 2 
              (April 2, 2007) 
              Notice of Availability 
              for Scoping Report, Part 2 
              Notice Regarding 
              Conclusions on EIR/EIS Alternatives to the Proposed Sunrise Powerlink 
              Project (March 16, 2007) 
             
               
                Figure 
                  1. Imperial Valley Link Alternatives 
                  Figure 2. 
                  Anza-Borrego Link Alternatives  
                  Figure 3. Central 
                  Link Alternatives 
                  Figure 4. 
                  Inland Valley Link Alternatives 
                  Figure 
                  5. Coastal Link Alternatives Retained 
                  Figure 
                  6. Coastal Link Alternatives Eliminated 
                  Figure 
                  7. Southwest Powerlink Alternatives 
               
             
              Notice of Second 
              Round of Scoping Meetings on Alternatives to the Proposed Sunrise 
              Powerlink Project (January 22, 2007) 
             
               
                Figure 1. 
                  Sunrise Powerlink Project Overview 
                  Figure 2. Imperial Valley 
                  Link Alternatives 
                  Figure 3. Anza-Borrego Link 
                  Alternatives  
                  Figure 4. Central Link Alternatives 
                  Figure 5. Inland Valley Link 
                  Alternatives 
                  Figure 6. Coastal Link Alternatives 
                  Retained 
                  Figure 7. Coastal Link Alternatives 
                  Eliminated 
                  Figure 8. Southwest Powerlink 
                  Alternatives 
                  Figure 9. Non-Wires Alternatives 
                  Figure 10. System Alternatives 
                   
               
             
              Scoping Report, Part 1 
              (November 29, 2006) 
              Notice of Availability for 
              Scoping Report, Part 1 (November 2006) 
              Notice of Preparation 
              (NOP) (September 15, 2006) 
             
               
                Figure 1. 
                  Proposed Project Overview 
                  Figure 2. Imperial Valley 
                  Link 
                  Figure 3. Anza-Borrego Link 
                  Figure 4A. Central Link 
                  Figure 4B. Proposed Central 
                  East Substation 
                  Figure 5A. Inland Valley 
                  Link 
                  Figure 5B. Detail of Ramona 
                  Area 
                  Figure 6A. Coastal Link 
                  Figure 6B. Rancho Peñasquitos 
                  Detail 
                  Figure 7. SDG&E Alternatives 
                  Fully Evaluated and Carried Forward in PEA 
                  Figure 8. SDG&E Alternatives 
                  Considered and Eliminated 
               
             
              Notice of Intent 
              (August 31, 2006) 
              SDG&E's 
              Application and Proponent's Environmental Assessment (August 4, 
              2006). 
           |