Proponent's Environmental Assessment - April
2010
Cover Page
Title Page
Table of Contents
Glossary of Acronyms
Index to CPUC
PEA Requirements
|
Executive
Summary |
1. Project
Description
Figure
1-1. Project Overview Map
Figure
1-2. Proposed Substation Site Aerial Map
Figure
1-3. Fulton-Fitch Mountain Distribution Planning Area Location
Map
Figure
1-4. Typical Three-Bank Substation Layout
Figure
1-5. Typical Three-Bank Substation Profile
Figure 1-6.
Typical Tubular Steel Pole
Figure 1-7.
Reconductoring of 12 kV Distribution Lines
Figure
1-8. Typical Joint Trench Configuration |
2. Alternatives
Analysis
Figure
2-1. Alternative Sites Location Map
Figure 2-2.
Land Use Designations
Figure 2-3. Site A Alternative
Figure 2-4. Site C Alternative |
3. Environmental
Impacts Summary |
4. Aesthetics
Figure
4-1. Photo Viewpoint Locations
Figure 4-2. Photographs of the
Project Area and Vicinity
Figure 4-3a. Existing View from
Mitchell Lane
Figure 4-3b. Visual Simulation
from Mitchell Lane (4.7MB)
Figure 4-4a. Existing View from
Cameron Drive
Figure 4-4b. Visual Simulation
from Cameron Drive
Figure 4-5a. Existing View from
Eagle Drive
Figure 4-5b. Visual Simulation
from Eagle Drive |
5. Air Quality |
6. Biological
Resources |
7. Cultural Resources
|
8. Geology, Soils, Mineral
Resources, and Paleontology |
9. Hazardous
Materials |
10.
Hydrology and Water Quality
Figure
10-1. Hydrology |
11. Land Use and
Planning, Recreation, and Agricultural Resources
Figure
11-1. General Plan Map |
12. Noise |
13. Population and Housing
|
14. Transportation
and Traffic |
15. Growth-Inducing
Cumulative Impacts
Figure
15-1. Planned Projects |
Attachments |
Attachment
A. Windsor Town Support Letter
Attachment
B. Air Quality Construction Phase Analysis, Supporting Data
Attachment
C. Calculations for Operations Emissions Estimates
Attachment
D. Native American Consultation
Attachment
E. Environmental Database Resources
Attachment F. Electric and
Magnetic Fields
Attachment
G. Properties within 300 Feet of the Project Site
|
Supplement to Proponent's
Environmental Assessment - May 2011
Cover,
Contents, Glossary, Acronyms
Executive Summary
1. Alternatives Analysis
2. Site 8 Project Description
3. Site 8 Environmental
Impact Assessment
4. Site 3 Project Description
5. Site 3 Environmental
Impact Assessment
Attachment A - Avoidance and Protection
Measures
Attachment B - Summary of Construction-Phase
Emissions, Site 8
Attachment C - Summary of Construction-Phase
Emissions, Site 3 |