STATE OF CALIFORNIA PUBLIC UTILTIES COMMISSION

Southern California Edison Company's Application for Authority to Sell Natural Gas-Fired Electrical Generation Facilities (Application No. 96-11-046)

TABLE OF CONTENTS

Acrobat Reader Download to view documents in Postscript Defined Format (PDF). Tables are viewable or downloadable as PDF files.

                     LIST OF TABLES
 
                      2.1    Descriptions of Southern California Edison Company Facilities  (10K)
                     3.1    Reasonably Expected Capacity Factors  (in text)
                      4.3.1  Active and Potentially Active Earthquake Faults Near
                         Edison's Power Plants
 (22K)
                      4.3.2 Recorded Earthquakes (greater than) 5.0 Magnitutde Near
                         Edison's Power Plants
 (7K)
                      4.4.1  Coastal Power Plants Seawater Cooling System Summary (5K)
                      4.4.2  Edison Coastal Generating Station NPDES Permits Summary (16K)
                      4.4.3 Edison Inland Facility NPDES Permits
                         and Cooling Water Discharges
 (12K)
                      4.5.1  State and National Ambient Air Quality Standards (8K)
                      4.5.2  Air Basin Attainment Designations (8K)
                      4.5.3  Ozone Levels, 1991-1995 (7K)
                      4.5.4  Nitrogen Dioxide Levels, 1991 (7K)
                      4.5.5  Carbon Monoxide Levels, 1991-1995 (8K) 
                      4.5.6  Sulfur Dioxide Levels, 1991-1995 (8K)
                      4.5.7  Suspended Sulfate Levels, 1991-1995  (9K)
                     4.12.1 Wastewater Disposal Facilities (in text)
                      4.12.2 Storm Water Drainage Facilities (in text)
                      4.16.1 Local Community Projects Within 1 Mile of the Power Plants (26K)
Top of Page | Back to Home Page | CPUC Home Page