STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSIONPACIFIC GAS AND ELECTRIC COMPANY’S APPLICATION
FOR AUTHORIZATION TO SELL CERTAIN GENERATING PLANTS AND RELATED ASSETS (APPLICATION
NO. 98-01-008)
|
Download Acrobat Reader
to view documents in Postscript Defined Format (PDF) files. The Draft EIR files are viewable as either PDF
Files or Text Only (html). The pdf files show the documents in their entirety including tables and figures and can be
downloaded for viewing off line. The text only files provide the Draft EIR text with figures and tables
linked in as PDF files. The Draft Environmental Impact Report (DEIR) is approximately 650 pages. It can be downloaded or viewed from the following Table of Contents: |
EXECUTIVE SUMMARY PDF File (464K), Text Only (35K) TABLE OF CONTENTS PDF File (22K) I. INTRODUCTION PDF File (218K), Text Only (28K) II. PROJECT DESCRIPTION PDF File (2,410K), Text Only (66K) III. APPROACH TO ENVIRONMENTAL ANALYSIS PDF File (51K), Text Only (39K) IV. ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION V. CUMULATIVE IMPACTS PDF File (154K), Text Only (123K) VI. ALTERNATIVES ANALYSIS PDF File (140K), Text Only (90K) VII. REPORT PREPARATION PDF File (18K), Text Only (17K) VIII. GLOSSARY AND ACRONYMS PDF File (49K), Text Only (37K) ATTACHMENTS
A. How Electric Industry Change Will Affect You PDF File (19K), Text Only (14K) B. Regulatory Background PDF File (22K), Text Only (11K) C. System Economic and Operational Characterization PDF File (162K), Text Only (134K) D. Notice of Preparation PDF File (390K) E. Hazardous Materials and Waste PDF File (72K), Text Only (5K) F. Geysers Power Plant Facility Layout Maps PDF File (1,122K) G. Divestiture Modeling Methodologies and Assumptions PDF File (340K), Text Only (57K)
LIST OF TABLES - (Not available, see individual text sections)
TOP | PG&E Divestiture Environmental Review Main Page | CPUC Home Page |