- Public comments recieved on the DEIR, may be viewed here.
- To view the complete DEIR without appendicies, click here [pdf 57.7mb].
- To view the Appendices for the DEIR, click here [pdf 281.1mb].
Notice of Availability (NOA) [pdf], Cover [pdf], Table of Content [pdf], and List of Acronyms [pdf]
Executive Summary [pdf]
1. Introduction [pdf]
2. Water Demand, Supplies, and Water Rights [pdf]
3. Project Description [pdf 6.67mb]
4. Environmental Setting, Impacts, and Mitigation Measures
4.1 Overview [pdf]
4.2 Geology, Soils, and Seismicity [pdf 4.08mb]
4.3 Surface Water Hydrology and Water Quality [pdf 5.06mb]
4.4 Groundwater Resources [pdf 16.1mb]
4.5 Marine Resources [pdf]
4.6 Terrestrial Biological Resources [pdf 3.98mb]
4.7 Hazards and Hazardous Materials [pdf]
4.8 Land Use, Land Use Planning, and Recreation [pdf]
4.9 Traffic and Transportation [pdf]
4.10 Air Quality [pdf]
4.11 Greenhouse Gas Emissions [pdf]
4.12 Noise and Vibration [pdf]
4.13 Public Services and Utilities [pdf]
4.14 Aesthetic Resources [pdf]
4.15 Cultural and Paleontological Resources [pdf]
4.16 Agriculture and Forestry Resources [pdf]
4.17 Mineral Resources [pdf]
4.18 Energy Conservation [pdf]
4.19 Population and Housing [pdf]
5. Cumulative Impacts [pdf]
6. MPWSP Variant [pdf 3.15mb]
7. Alternatives [pdf 10.3mb]
8. Growth-Inducement Potential and Secondary Effects of Growth [pdf]
9. CEQA Statutory Sections [pdf]
10. Report Preparers [pdf]
Appendices
A. NOP and NOP Scoping Report [pdf 3.6mb]
B1. MPWSP Plant Sizing Data: Various Five- and Ten-Year Normal, Dry, and Maximum Month Demand Scenarios [pdf]
B2. State Water Board Final Analysis of the Monterey Peninsula Water Supply Project [pdf 22.4mb]
C1. Analysis of Historic and Future Coastal Erosion with Sea Level Rise [pdf 7.0mb]
C2. Coastal Water Elevations and Sea Level Rise Scenarios [pdf]
C3. Exploratory Borehole Results [pdf 69.2mb]
D1. Far-Field Analysis of Brine Discharge [pdf 10.6mb]
D2. Brine Discharge Diffuser Analysis [pdf]
D3. Water Quality Analysis of the Discharges [pdf]
D4. Ocean Plan Compliance Assessment [pdf 4.05mb]
E1. Test Slant Well Groundwater Modeling and Analysis - CEMEX Active Mining Area [pdf 9.82mb]
E2. Monterey Peninsula Water Supply Project Groundwater Modeling and Analysis [pdf 127mb]
F. Special-status Plant and Wildlife Species Considered [pdf]
G. Air Quality and Greenhouse Gas Emissions Calculations [pdf]
H. Pure Water Monterey Groundwater Replenishment Project, Project Description [pdf 24.4mb]
I. Component Screening Results [pdf]
J1. Coastal Water Project EIR Analysis: MPWMD 2006 Estimate of Long-Term Water Needs Compared with Growth Anticipated in Jurisdictions General Plans [pdf]
J2. Secondary Effects of Growth [pdf]
|