STATE OF CALIFORNIA
GRAY DAVIS, Governor

PUBLIC UTILITIES COMMISSION
505 VAN NESS AVENUE
SAN FRANCISCO, CA 94102-3298


MITIGATED NEGATIVE DECLARATION
PACIFIC GAS AND ELECTRIC COMPANY
APPLICATIONS NO. 00-05-029 AND 00-05-030
PROPOSAL FOR DIVESTITURE


PROJECT DESCRIPTION

To enhance competition, the California Public Utilities Commission (CPUC) requested that Pacific Gas and Electric (PG&E) voluntary divest ownership of some its generating capacity. PG&E’s divestiture applications (Application No. 00-05-029 and 00-05-030) originally filed in May 2000, responds to the CPUC’s request for voluntary divestiture and seeks authority to transfer and donate certain lands in the Federal Regulatory Commission’s (FERC’s) Pit 1, 2, 3, and 4 Hydroelectric Projects. Approval of the transfer and donation is now being considered by the CPUC.

PG&E currently possesses transmission and distribution lines, a gauging station, and a canal diversion on McArthur Swamp. Control of the land also allows PG&E to prevent others from acquiring or using water rights that might interfere with hydroelectric production at the downstream Pit River Powerhouses. With adequate easements and reservations of ownership in water rights and the transmission and distribution facilities, however, it is not foreseeable that the fee interest in the properties will ever again be useful for public utility purposes.

The donation of McArthur Swamp, the Glenburn Dredge Site, and the dredge to the California Waterfowl Association (CWA) is in the economic interest of PG&E’s ratepayers and also provides many societal benefits (Application 00-05-029). Removal of McArthur Swamp from the Pit 1 Project License will reduce the overall costs of that license and, at the same time, will increase the Pit 1 Project’s market value. Such removal, however, can only be accomplished with the approval of FERC.

PG&E also seeks to market value McArthur Swamp and the Glenburn Dredge Site in response to AB 1890. AB 1890 requires the Commission to market value all non-nuclear generating facilities by December 31, 2001. AB 1890 specifies that the market value of generation assets may be determined through a sale, appraisal or other divestiture.

Figure 1

The transfers proposed as part of the Burney Falls Application 00-05-30 grew out of discussions between State Department of Parks and Recreation (DPR) and PG&E concerning potential liability for failing to maintain the State Park Levee, north of the McArthur Swamp, as well as discussions with various resource agencies about adjusting the Pit 1 Project License boundaries to remove McArthur Swamp and transfer certain levee maintenance obligations outside the license. The combined transactions that have resulted from these discussions have the benefit of (1) resolving a potential dispute, (2) facilitating the FERC’s approval to remove McArthur Swamp from the Pit 1 Project boundaries, (thereby reducing costs and enhancing the project’s value), (3) preserving existing land uses for conservation and recreational purposes (4) preserving water rights and water flows that support hydroelectric operations, and (5) relieving PG&E and its ratepayers of obligations of land ownership, such as responsibility for taxes or environmental liabilities. PG&E also seeks to market value Burney Falls and Bowman Ditch in response to Assembly Bill 1890 (AB 1890). These lands would be transferred for the Ahjumawi Property from DPR.

Approval of the specific divestiture plans by the CPUC is required by the Public Utilities Code Section 851 prior to the transfer of these mentioned lands. It is the responsibility of the CPUC to determine whether the proposed divestiture plans "will be adverse to the public interest."

The transfer and donation of these lands would include the transfer of land entitlements, permits, conservation easement, and a management plan. A more detailed project description is included in the attached Initial Study.

ENVIRONMENTAL DETERMINATION

An initial study (attached) was prepared to assess the potential effects on the environment of the divestiture project, and the respective significance of those effects. Based on the Initial Study, the proposed divestiture of PG&E’s hydroelectric assets will have less than significant effects or no impact in the areas of:

  • Land Use Planning
  • Population and Housing
  • Transportation/Circulation
  • Mineral Resources
  • Hydrology and Water Quality
  • Public Services
  • Aesthetics
  • Utility and Service systems
  • Recreation
  • Hazards and Hazardous Substances
  • Geology and Soils
  • Biological Resources
  • Noise
  • Cumulative Impacts

The Initial Study indicates that PG&E’s proposed divestiture would have potentially significant impacts in the areas of:

  • Air Quality
  • Cultural Resources

Each of the identified impacts can be mitigated to avoid the impact or reduce it to a less than significant level. The mitigation measures, which PG&E has agreed to include in the project, are as follows:

Air Quality

Mitigation Measure III.1
During construction the following measures shall be implemented to control fugitive dust and particulate emissions in compliance with SCAPCD SMMs. The SMMs shall be included as conditions of approval to the grading permit issued by the Shasta County Environmental Health Department and, as appropriate shall appear on the final construction plans submitted for the permit’s approval. A copy of the grading permit shall be submitted to the CPUC’s Mitigation Monitor prior to the commencement of ground disturbing activities.

  • All material excavated, stockpiled, or graded shall be sufficiently watered to prevent fugitive dust from leaving property boundaries and causing a public nuisance or a violation of an ambient air quality standards. Watering shall occur at least twice daily with complete site coverage, preferably in the mid-morning and after work is completed each day.
  • All areas (including unpaved roads) with vehicle traffic shall be watered periodically or have dust palliatives applied for stabilization of dust emissions.
  • All on-site vehicles shall be limited to a speed of 15 miles per hour on unpaved roads.
  • All land clearing, grading, earth moving or excavation activities on the project site shall be suspended when winds are expected to exceed 20 miles per hour.
  • All inactive portions of the development site shall be seeded and watered until a suitable grass cover is established.
  • The contractor shall be responsible for applying non-toxic stabilizers (according to manufacturers specifications) to all inactive construction areas (previously graded areas which remain inactive for 96 hours), in accordance with the Shasta County Grading Ordinance.
  • All trucks hauling dirt, sand, soil or other loose material shall be covered or shall maintain at least two feet of freeboard in accordance with the requirements of CVC Section 23114. This provision is enforced by local law enforcement agencies.
  • All material transported offsite shall be either sufficiently watered or securely covered to prevent a public nuisance.
  • During initial grading, earth moving, or site preparation, the project shall be required to construct a paved (or dust palliative treated) apron, at least 100 feet in length, onto the project site from the adjacent paved road(s).
  • Paved streets adjacent to the development site shall be swept or washed at the end of each day to remove excessive accumulations of silt and/or mud which may have accumulated as a result of activities on the development site.
  • After construction, the transfer recipient shall re-establish ground cover on the construction site through seeding and watering in accordance with Shasta County Grading Ordinance.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) of a commitment to adhere to the terms of the grading permit for five years, and shall give notice of such commitment to the air quality regulations to the SCAPCD.

    Responsibility: CPUC

    Timing: Prior to approval of the final construction plans submitted for the permit’s approval.

Cultural Resources

McArthur Swamp

Mitigation Measure V.1a
Prior to the transfer of title of the McArthur Swamp, the applicant shall include specific language in the proposed Conservation Easement and MSMP requiring CWA to appoint a Professional Archaeologist (who is a member of the Registry of Professional Archaeologists), or Archaeologists, at least 15 days prior to the start of project-related vegetation clearance ground disturbance and grading, site or project mobilization, site preparation or excavation activities, implementation of erosion control measures, or movement or parking of heavy equipment or other vehicles onto or over unpaved or natural areas resulting from habitat improvements pursuant to the MSMP. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title. As shall be specified in this new language, CWA shall provide the CPUC with the name(s) and statement of qualifications of its designated Professional Archaeologist (s) who will be responsible for implementation of all project-related cultural resources mitigation measures. The statement of qualifications must be sufficient to substantiate that the Archaeologist(s) meets the Secretary of the Interior’s proposed Historic Preservation Qualification Standards as published in the Federal Register (United States Department of the Interior 1997).

At least 10 days prior to the start of any project-related activity defined above, CWA shall confirm in writing to the CPUC Mitigation Monitor that the approved designated Professional Archaeologist will be available at the start of project activities and is prepared to implement the protocol specified in the MSMP.

At least 10 days prior to the replacement of a designated cultural resource specialist, CWA shall obtain the CPUC approval of the proposed replacement Professional Archaeologist.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological mitigation program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title.

Mitigation Measure V.1b
Prior to the transfer of title of the McArthur Swamp and Glenburn Dredge Site, the applicant shall amend the proposed Conservation Easement and MSMP to include specific language requiring that prior to the commencement of construction and/or ground disturbing activities, the designated Professional Archaeologist shall provide all construction personnel with environmental training in a manner that will inform them of the possibility of encountering cultural or historical resources. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title. All construction personnel will be trained in the identification of archaeological resources (which could include flaked stone, projectile points, mortars, pestles, soil containing shell and bone, or human burials), historic resources (which could include stone features, such as adobe foundations or walls, structures and remains with square nails, and refuse deposits), human remains, and paleontological resources (which could include true and/or trace fossils). In addition, the construction personnel would be trained on the appropriate protocol to follow if any resources are found, as discussed in Mitigation Measures V.3, V.4, and V.5.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed construction personal training program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title and prior to the commencement of any construction and/or ground disturbing activities.

Mitigation Measure V.1c
Prior to the transfer of title of the McArthur Swamp, the applicant shall amend the proposed Conservation Easement and MSMP to include specific language requiring that in the event that previously unidentified historic, archaeological, and/or paleontological resources are encountered during habitat improvement activities, the construction crew will halt work within a 100-foot radius of the find and not collect or disturb the materials until the Professional Archaeologist has evaluated the location and determined an appropriate mode of action. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title. The Professional Archaeologist retained by CWA shall evaluate such resources for California Register of Historical Resources eligibility ensuring that the evaluations are supervised by individuals meeting the Secretary of the Interior’s proposed Historic Preservation Qualification Standards (United States Department of the Interior 1997) for each particular resource type. An evaluation form shall be submitted to the CPUC, CWF, and the California Historical Resources Information Center. If the Professional Archaeologist determines that the resources are eligible for the California Register of Historical Resources, the Professional Archaeologist shall determine the appropriate action to be taken with preference given to preserving the resources in situ. If it is infeasible to be consistent with the objectives of the MSMP to leave the resources in place, the Professional Archaeologist shall conduct data recovery, if determined necessary to mitigate any significant project-related effects. If cultural resources are encountered during construction, Construction may resume once the Professional Archaeologist has determined (and implemented, if appropriate) an appropriate mode of action and has given the authorization to proceed.

Upon approval of this plan by the CPUC Mitigation Monitor, mitigation measures will be implemented prior to any project-related activities within 100 feet of the resource’s boundary.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological monitoring program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title. Upon approval of this plan by the CPUC Mitigation Monitor, mitigation measures will be implemented prior to any project-related activities within 100 feet of a newly discovered resource’s boundary.

Mitigation Measure V.1d
Prior to the transfer of title, the Conservation Easement and MSMP shall be amended to include language requiring CWA to notify a qualified paleontologist of unanticipated paleontological discoveries, made by either the Professional Archaeologist or construction personnel responding to their environmental training classes, and document the discovery as needed. In the event of an unanticipated discovery of true or trace fossil remains during construction, excavations within a 100-foot radius of the find shall be temporarily halted or diverted until the discovery is examined by a qualified paleontologist. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. Significant fossils shall be salvaged through a program of excavation, analysis, and documentation. Fossil remains collected during the salvage program shall be cleaned, sorted, catalogued, and then deposited in a public, non-profit institution with research interests in the materials. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological monitoring program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title.

Mitigation Measure V.1e
Prior to the transfer of title, the Conservation Easement and MSMP shall be amended to require CWA’s contractors to immediately stop all work in the event human remains are found during the MSMP’s activities within a 100-foot radius of the find. Following any such discovery, the Professional Archaeologist shall be notified immediately and will, in turn, immediately notify the Shasta County coroner, in compliance with Section 7050.5 of the California Health and Safety Code.

If the human remains are determined to be Native American in origin, the Shasta County coroner will notify the Native American Heritage Commission (NAHC) within 24 hours of the find. The most likely descendent shall be given an opportunity to make recommendations to the CWA and its contractors for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98. Where conditions A, B, and/or C under Section 15064.5 (e) (2) occur, the landowner or authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location not subject to further subsurface disturbance. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological monitoring program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title.

Mitigation Measure V.1f
Prior to the transfer of title, the Conservation Easement and MSMP shall be amended to require CWA to provide the opportunity for a Native American monitor, if interested, to be present on-site during project-related vegetation clearance, ground disturbance and grading, site or project mobilization, site preparation or excavation activities, implementation of erosion control measures, or the movement or parking of heavy equipment or other vehicles onto or over the project surface, within 500 feet of the boundary of known prehistoric resources and within 500 feet of the locations of modern and historic streams.

The Native American monitor shall be a member of the Ahjumawi Tribe and will serve in addition to the Professional Archaeologist. Monitoring by the cultural group representative is required within 500 feet of such sites. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title.

    Monitoring Action: The receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological monitoring program.

    Responsibility: CPUC

    Timing: Amended language shall be inserted into the Conservation Easement and MSMP prior to the transfer of title. A Native American monitor shall be notified 10 days prior to any project-related activities within 500 feet of the boundary of known prehistoric resources and within 500 feet of the locations of modern and historic streams.

Glenburn Dredge Site

Mitigation Measure V.2
Prior to the transfer of title, the Conservation Easement shall be amended to include the portion of the Glenburn Dredge Site property that is bounded by the fence required by this mitigation measure and the Fall River. The Conservation Easement shall include language requiring that the new owner establish permanent protection of sensitive resources. The amended Conservation Easement and MSMP shall be submitted to the CPUC for review and approval prior to the transfer of title. The new conservation easement shall restrict any uses of this area of the site, except for the sole purpose of preserving the integrity of the sensitive resource. In addition, the Conservation Easement and MSMP shall be amended to include a requirement to reconfigure the existing fence layout at Glenburn to restrict access on and around sensitive resources. The Conservation Easement and MSMP, as amended, shall provide that a four-strand barbed-wire fence effective to serve as a barrier to human and livestock access and shall be constructed at a location 100 feet from the boundary of the sensitive site or along the property line where it is closer than 100 feet from the boundary of the sensitive site (but not along the river). Construction of the fence shall comply with the protocols specified in Mitigation Measures V.1a-V.1f. The Conservation Easement and MSMP shall further be amended to provide for regular inspection and maintenance of the fence to ensure that it continues to be a barrier to access.

    Monitoring Action: The donating and receiving parties shall submit documentation to the California Public Utilities Commission (CPUC) Mitigation Monitor of a commitment to participate in the CPUC proposed archaeological monitoring program.

    Responsibility: CPUC

    Timing: Newly amended language contained in the Conservation Easement and MSMP prior to the transfer of title. Establishment of the reconfigured fencing layout prior to reintroducing public access to the Fall River at the Glenburn site.