Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your computer system, then browse to that folder and double-click the downloaded file to open it in Acrobat. Please note some documents may take a few minutes to load due to the large file sizes.

 

The CPUC submitted Deficiency Reports to PG&E requesting specific information that was not included with the Application or PEA. PG&E addressed the CPUC's comments and provided material identified in the Deficiency Reports.Deficiency Reports for the project and PG&E’s responses are summarized in the following table:


CPUC Deficiency Report
PG&E Response and Status
Deficiency Report #1
(December 23, 2015)

Response #1 (January 22, 2016)

Table of Responses #1
Attachment: Revised Typical Structure Drawings
Attachment: Air Quality and Greenhouse Gas Calculations
Attachment: EDR Report
Attachment: New Affected Properties Spreadsheet

Response #1A (January 25, 2016)

Letter #1A
Attachment: Biological Resources Technical Report (GANDA 2012) (Confidentiality Withdrawn)
Attachment: Addendum #1 to the Biological Resources Technical Report (TRC 2015) (Confidentiality Withdrawn)
Attachment: Raptor Survey (TRC 2015) (Confidentiality Withdrawn)
Attachment: Bat Survey (TRC 2015) (Confidentiality Withdrawn)
Attachment: Wetland Delineation Report (TRC 2015) (Confidentiality Withdrawn)
Attachment: Water Crossing Mapping (GANDA 2016) (Confidentiality Withdrawn) Attachment: Cultural Resources Reports and GIS data (NCRM 2011, TRC 2015, and Quercus 2015) (Confidential)
Attachment: Paleontological Report (TRC 2015) (Confidentiality Withdrawn)
Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential)

Response #1B (January 29, 2016)

Letter #1B
Attachment: Detailed Map Book (Confidentiality Withdrawn)
Attachment: Existing General Arrangement Plans (Confidentiality Withdrawn)
Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential)

Response #1C (February 5, 2016)

Email #1C
Attachment: Project Map

Response #1D (February 26, 2016)
Attachment: Detailed Project Map

Response #1E (July 8, 2016)
Letter #1E
Attachment: Cultural Survey Memo (TRC 2016) (Confidential)
Attachment: Addendum #2 to the Biological Resources Technical Report (TRC 2016) (Confidentiality Withdrawn)


Deficiency Report #2
(February 19, 2016)


Response #1 (March 18, 2016)
Table of Responses #1
Attachment: GIS data for alternate workspaces and access routes (Confidential)

Response #2 (April 1, 2016)
Attachment: Preliminary Helicopter Use Plan

Response #3 (April 22, 2016)
Attachment: Revised DRAFT Wetland Delineation Report (TRC 2016) (Confidentiality Withdrawn)


Deficiency Report #3
(April 7, 2016)

Response #1 (April 26, 2016)
Letter #1
Attachment: Cultural Memo RE P-49-001179 and APM CR-1 (Confidential Information Redacted)
Response (August 23, 2016)
Letter #1 (Note: Materials where PG&E withdrew claims of confidentiality under PUC Section 583 are marked above)



Website info

This page contains tables and is best viewed with Firefox or Internet Explorer.
Please report any problems to the Energy Division web coordinator .

   
   
 

Project Home Page - CPUC Environmental Information - CPUC Home - Top