CPUC Seal  

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Pacific Gas & Electric  
Fulton-Fitch Mountain Reconductoring Project

Application No. A.15-12-005

 

Application and PEA


Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.

 
Please Note: Due to file size, some documents may take a few minutes to load.

Application

Proponent's Environmental Assessment


Title Page and Table of Contents

Index to CPUC PEA Requirements

1. PEA Summary

2. Project Description

3. Introduction

3.1 Aesthetics


3.2 Agricultural and Forest Resources


3.3 Air Quality

3.4 Biological Resources


3.5 Cultural Resources

3.6 Geology and Soils

3.7 Greenhouse Gases


3.8 Hazards and Hazardous Materials

3.9 Hydrology and Water Quality


3.10 Land Use and Planning


3.11 Minerals

3.12 Noise

3.13 Population and Housing

3.14 Public Services


3.15 Recreation

3.16 Transportation and Traffic 

3.17 Utilities

3.18 Mandatory Findings of Significance

APPENDICES

A. Affected Properties within 300 feet

B. EMF Discussion

C. Greenhouse Gas Calculations

D. Native American Heritage Consultation

E. Nesting Bird Buffer

F. List of Preparers

Website info

This page contains tables and is best viewed with Firefox or Internet Explorer.
Please report any problems to the Energy Division web coordinator .

   
   
 

Project Home Page - CPUC Environmental Information - CPUC Home - Top