STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Williams Communication, Inc. Fiber Optic Cable System Installation Project

Point Arena to Sacramento Route
Point Arena to Robbins Route

Subsequent Initial Study/Draft Mitigated Negative Declaration

Sections

Section Title

Document Size

Table of Contents

Table of Contents (pdf)

7 Kb

Acronyms

List of Acronyms and Abbreviations (pdf)

38 Kb

Executive Summary

Executive Summary (pdf)

31 Kb

Chapter 1

Introduction (pdf)

25 Kb

Chapter 2

Project Description (pdf)

81 Kb

Chapter 3

Project Route Description (pdf)

26 Kb

Chapter 4

Environmental Setting For Riverside to San Diego (pdf)

147 Kb

Chapter 5

Environmental Impacts And Mitigation Measures For Riverside to San Diego (pdf)

306 Kb

Chapter 6

Citations (pdf)

14 Kb

Figure

Figure Description

Document Size

Figure 1-1

Locations of Fiber Optic Cable Project Routes in California (pdf)

248 Kb

Figure 2-1

Typical Manhole and Handhole (pdf)

960 Kb

Figure 2-2

Plowed Installation (pdf)

1564 Kb

Figure 2-3

Trenched Installation (pdf)

580 Kb

Figure 2-4

Bridge Attachment (pdf)

1450 Kb

Figure 2-5

Directional Boring (pdf)

1613 Kb

Figure 2-6

Typical Regenerator Station Sites (pdf)

380 Kb

Figure 2-7

General Field Organization for the Williams Fiber Optic Cable System Project (pdf)

165 Kb

Figure 3-1

Riverside to San Diego Project Route (pdf)

884 Kb

Figure 3-2

Riverside to San Diego Project Route Regenerator/OP-AMP Station Locations (pdf)

660 Kb

Figure 4.III-1

California Air Basins (pdf)

219 Kb

Appendices A-K of the Subsequent Initial Study/Draft Mitigated Negative Declaration are not available online. They can be found in the hard copy of the report at the local repositories.

Appendix

Appendix Description

Appendix A.

Environmental Checklist Form

Appendix B.

Possible Environmental-Related Permits And Agency Approvals For The Riverside to San Diego Project Route

Appendix C.

Storm Water Pollution Prevention Plan

Appendix D.

Environmental Compliance Checklist for Proposed Regenerator/OP-AMP Sites

Appendix E.

Resource Tables

Appendix F.

Mitigation Monitoring Plan

Appendix G.

Fire Prevention And Response Plan

Appendix H.

Biological Species List

Appendix I.

Consultation And Coordination

Appendix J.

Summary Of Prefield And Historical Research

Appendix K.

Background Information On Acoustics

      

  

This site contains tables and is best viewed with Netscape or Microsoft Explorer browsers. Please report any problems to the Energy Division web coordinator.