Figure |
Figure Description |
Document Size |
Figure 1-1 |
Locations of Fiber Optic Cable Project Routes in California (pdf) |
248 Kb |
Figure 2-1 |
Typical Manhole and Handhole (pdf) |
960 Kb |
Figure 2-2 |
Plowed Installation (pdf) |
1564 Kb |
Figure 2-3 |
Trenched Installation (pdf) |
580 Kb |
Figure 2-4 |
Bridge Attachment (pdf) |
1450 Kb |
Figure 2-5 |
Directional Boring (pdf) |
1613 Kb |
Figure 2-6 |
Typical Regenerator Station Sites (pdf) |
380 Kb |
Figure 2-7 |
General Field Organization for the Williams Fiber Optic Cable System Project (pdf) |
165 Kb |
Figure 3-1 |
Riverside to San Diego Project Route (pdf) |
884 Kb |
Figure 3-2 |
Riverside to San Diego Project Route Regenerator/OP-AMP Station Locations (pdf) |
660 Kb |
Figure 4.III-1 |
California Air Basins (pdf) |
219 Kb |
Appendix |
Appendix Description |
Appendix A. |
Environmental Checklist Form |
Appendix B. |
Possible Environmental-Related Permits And Agency Approvals For The Riverside to San Diego Project Route |
Appendix C. |
Storm Water Pollution Prevention Plan |
Appendix D. |
Environmental Compliance Checklist for Proposed Regenerator/OP-AMP Sites |
Appendix E. |
Resource Tables |
Appendix F. |
Mitigation Monitoring Plan |
Appendix G. |
Fire Prevention And Response Plan |
Appendix H. |
Biological Species List |
Appendix I. |
Consultation And Coordination |
Appendix J. |
Summary Of Prefield And Historical Research |
Appendix K. |
Background Information On Acoustics |