Appendix A. Maps / Drawings
Appendix B. Air Quality / Greenhouse Gases Tech Report (Revised Nov. 2023) (38MB)
Appendix C. Biological Resources Assessment (Revised Nov. 2023)
Appendix D. Cultural Resources Report (12MB)
Appendix E. Tribal Consultation Report
Appendix F. Phase I ESA (78MB)
Appendix G. Public Outreach (96MB)
Appendix H. Preliminary Construction FPP (Revised Nov. 2023)
Appendix I. Geotechnical Report
Appendix J. Paleo Inventory
Appendix K. Hazardous Materials Business Plan and Integrated Storm Water and Oil Spill Prevention, Control, and Countermeasure Plan
Appendix L. Hydrology Drainage Study
Appendix M. Noise Modeling
Appendix N. VCM Flow Data
Appendix O. Preliminary Health and Safety Plan (Revised Nov. 2023)
Appendix P. Technical Design Standards
Appendix Q. Pipeline Repair
Appendix R. Traffic Plan (Added Nov. 2023)
Amended Proponent's Environmental Assessment (November 21, 2023)
SoCalGas Response to PEA Completeness Review:
SoCalGas Cover Letter - 11-21-2023
Response to PEA Completeness Report - November 2023
Appendix A-2: Conceptual Site Plan Supplemental EDC Alternative
Appendix S. Risk Assessment (Initial Version, April 2024)
SoCalGas Response to Second PEA Completeness Review:
SoCalGas Cover Letter - 07-08-2024
SoCalGas Cover Letter - 10-11-2024
Response to Comment (2nd Review) - 07-08-2024
VCM Fugitives Venting Analysis - October 2024
Appendix S (Risk Assessment) - July 2024
|