STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION

Pacific Gas and Electric Company's Vasona Substation Environmental Review

TABLE OF CONTENTS

Download to view documents in Postscript Defined Format (PDF). Text files are viewable as either htm or pdf files. The pdf files show the documents in their entirety including tables and figures and can be downloaded. Figures are saved as gif files and range from 19k to 235k files. Set your browser to white background to view figures.

The Negative Declaration (30K) and the Initial Study (801K) can be downloaded in their entirety. For viewing purposes, the Initial Study has been separated into sections, according to the following Table of Contents:

ENVIRONMENTAL CHECKLIST (24K)

I. Land Use and Planning (9K)
II. Population and Housing (4K)
III. Geologic Problems (16K)
IV. Water (16K)
V. Air Quality (9K)
VI. Transportation / Circulation (11K)
VII. Biological Resources (5K)
VIII. Energy and Mineral Resources (3K)
IX. Hazards (16K)
X. Noise (6K)
XI. Public Services (7K)
XII. Utilities and Service Systems (6K)
XIII. Aesthetics (9K)
XIV. Cultural Resources (3K)
XV. Recreation (2K)
XVI. Mandatory Findings of Significance (8K)

REFERENCES (9K)

REPORT PREPARERS (3K)

  
TOP Vasona Substation Main Page PG&E Substation Projects Main Page CPUC Home Page