Cover Page, Front Matter,
and Notice of Intent
|
| |
A. |
Mitigated Negative Declaration |
| |
B. |
Initial Study |
| |
|
Project Description |
| |
|
Environmental Determination |
| |
|
Environmental Analysis and Mitigation |
| |
|
Fig. 1. Regional
Vicinity Map |
| |
|
Fig. 2. Proposed
Substation Site and 66 kV Subtransmission Line Route |
| |
|
Fig. 3. Santiago System Capacity and Peak Demand
(see page 8 of Section B) |
| |
|
Fig. 4. Proposed
Viejo Substation Site Plan |
| |
|
Fig. 5. Towers
and Poles Proposed for Viejo Substation |
| |
|
Fig. 6. Existing
66 kV Tubular Steel Poles (TSP) and Proposed H-Frames |
| |
|
Fig. 7. Proposed
Transmission/Subtransmission Line Configuration and Proposed H-Frame
Locations (2.9 MB) |
| |
|
Fig. 8. Proposed
Telecommunications Line Route |
| |
|
Fig. 9. Magnetic Field Levels (see
page 28 of Section B) |
| |
|
Fig. 10. Location
of Key Viewpoints |
| |
|
Fig. 11. Key
Viewpoint 1 (Florence Joyner Olympiad Park) - Existing View |
| |
|
Fig. 12. Key
Viewpoint 1 (Florence Joyner Olympiad Park) - Simulation |
| |
|
Fig. 13. Key
Viewpoint 2 (Melinda Road) - Existing View |
| |
|
Fig. 14. Key
Viewpoint 2 (Melinda Road) - Simulation |
| |
|
Fig. 15. Key
Viewpoint 3 (Ponderosa) - Existing View |
| |
|
Fig. 16. Key
Viewpoint 3 (Ponderosa) - Simulation (2.5 MB) |
| |
|
Fig. 17. Key
Viewpoint 4 (Painted Trails) - Existing View |
| |
|
Fig. 18. Key
Viewpoint 4 (Painted Trails) - Simulation |
| |
|
Fig. 19. Key
Viewpoint 5 (Sweet Meadow) - Existing View (2.2 MB) |
| |
|
Fig. 20. Key
Viewpoint 5 (Sweet Meadow) - Simulation (2.3 MB) |
| |
|
Fig. 21. Key
Viewpoint 6 (Canyon Crest) - Existing View |
| |
|
Fig. 22. Key
Viewpoint 6 (Canyon Crest) - Simulation |
| |
|
Fig. 23. Key
Viewpoint 7 (Canyon Crest) - Existing View |
| |
|
Fig. 24. Key
Viewpoint 7 (Canyon Crest) - Simulation |
| |
|
Fig. 25. Key
Viewpoint 8 (Canyon Crest) - Existing View |
| |
|
Fig. 26. Key
Viewpoint 8 (Canyon Crest) - Simulation |
| |
|
Fig. 27. Key
Viewpoint 9 (Palmia) - Existing View |
| |
|
Fig. 28. Key
Viewpoint 9 (Palmia) - Simulation |
| |
|
Fig. 29. Key
Viewpoint 10 (Substation - El Toro Road) - Existing View |
| |
|
Fig. 30. Key
Viewpoint 10 (Substation - El Toro Road) - Simulation |
| |
|
Fig. 31. Simulated
View of Viejo Substation with Proposed Block Wall |
| |
|
Fig. 32. Aliso Creek and San Juan Creek Watersheds
(see page 103 of Section B) |
| |
|
Fig. 33. Recreational
Areas Along the Transmission Corridor (2.0 MB) |
| |
C. |
Mitigation Monitoring Program |
| |
Appendices |
| |
1. |
References |
| |
2. |
List of Preparers
and Reviewers |
| |
3. |
Electric and Magnetic
Fields and Other Field-Related Concerns |
| |
4. |
Air Quality
Calculations |
| |
5. |
SCE Standard Best
Management Practices |
| |
6. |
Cumulative
Projects List |
| |
7. |
Work Area Protection
and Traffic Control Manual |
| |
 |
|
 |