SCE Deficiency Report 1 ResponseResponse 1a Attachments
Attachment 1: SCE's Instructions to Obtain Response to Deficiency Report Attachment 2: Notice of Availability of Response to Deficiency Report and Certificate of Service Response 1b Attachments are renumbered below to correspond to the Deficiency Request question number. Attachment DR1: a) List and Map of Approved Projects b) IS/MND Riverbend, Master Case 1201 c) IS/MND Vernola Marketplace Apartments, Master Application 1485 Attachment DR2: a) List and Map of Approved Projects (Same as Attachment DR1 above) b) SCE Visual Simulations Attachment DR3: a) Siting Report - Alternative Segment Re-route Feasibility Study b) Underground Alternatives Desktop Study Supplemental Response Attachments Attachment 1: RTRP Preliminary Estimated Cost Comparison of Underground Alternatives Desktop Study Attachment 2: Underground Alternative Routes Desktop Study and Certificate of Service SCE Deficiency Report 2 ResponseAttachment
numbers correspond to the Deficiency Request question number.
Attachment DR1: Preliminary Engineering and Detailed Route Maps Attachment DR 2: Noise Technical Report (March 2016) -- Updated by Noise Technical Report on 8/8/2017 Attachment DR 3: Aesthetics and Visual Resources Technical Report Attachment DR3: Revised Aesthetics and Visual Resources Technical Report Attachment DR 5: Mapped Locations and GIS Data for New Utility Lines--Confidential Attachment DR7: AECOM's Summary of Archaeological and Built Environment Resources Records --Confidential Attachment DR8: SCE's Hazardous Materials Database Records Attachment DR9: a) Emissions Calculations b) Modeling Output Files c) Technical Memo Attachment DR10: Maps Attachment DR13: GIS Data Attachment DR18: Project Approval by CAISO per Administrative Record Document No. 167 Attachment DR19: SCE 2006-2027 Transmission Expansion Plan--Confidential SCE Deficiency Report 3 ResponseAttachment
numbers correspond to the Deficiency Request question number.
Attachment DR2: SCE Vista 66 kV Operating Diagram--Confidential Attachment DR4: 2015 Peak Loading from the SCE Vista 66 kV substation as of 10/22/2015--Confidential Attachment DR5: Individual Transformer Bank Loading for 220/66 kV transformers at Vista provided in Q4--Confidential Attachment DR6: Internal Riverside Generation Operating Levels at the time of 2015 peak per Q4--Confidential SCE Revised Deficiency Report 4 ResponseAttachment
numbers correspond to the Deficiency Report question number.
Attachment DR1: GIS Map Book Hybrid Route Attachment DR1: Data Dictionary Attachment DR2: GIS Map Book Access Roads Attachment DR2: Data Dictionary Attachment DR3: Data Dictionary Attachment DR3: GIS Map Book Hybrid Route Construction Areas Attachment DR4: Land Disturbance Table Attachment DR5: Conceptual Draft Double Circuit 220 kv Duct Bank Attachment DR6: Cultural Resource Survey Results- Confidential Attachment DR8: Focused Survey Report Attachment DR8: Habitat Letter Report Attachment DR8: Underground Habitat Assessment Attachment DR8: Remaining Survey Schedule Attachment DR8: Rare Plants Survey Spring 2017 Attachment DR9: RTRP Hybrid Schedule Attachment DR10: Equipment and Workforce Estimates Attachment DR12: Conceptual Draft Double Circuit 220 kv Duct Bank Attachment DR12: Alternatives Desktop Study Attachment DR13: Design of Riser Poles Attachment DR14: Cross Section of Underground Vault Attachment DR14: Cross Section of Telecommunications Manhole Attachment DR15: Noise Technical Report and Attachments (November 2016) -- Updated by Noise Technical Report on 8/8/2017 Attachment DR16: Traffic Impact Study Attachment DR18: Emissions and Air Quality Modeling Results Attachment DR18: Summary of Revised Unmitigated Emmissions Estimates Attachment DR19: EMF Analysis for the Underground Segment SCE Data Request 1 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment Q03: Updated Access Roads KMZ- Confidential Attachment Q06: Focused Survey for Delhi Sands Flower-Loving Fly (2006) Attachment Q06: 2006 Delhi Flower Loving Fly Surveys Aerial Photo Attachment Q06: Species Locations Attachment Q06: Second Year Focused Survey for Delhi Sands Flower-Loving Fly (2017) Attachment Q07: Burrowing Owl and Riparian Bird Species Habitat Assessment Attachment Q08: San Bernadino Kangaroo Rat and Los Angeles Pocket Mouse Survey Attachment Q09: UPS Delivery Receipt Cultural Resources Technical Report Attachment Q09: Appendix A- Confidential Attachment Q09: Appendix B- Confidential Attachment Q09: Appendix C- Confidential Attachment Q09: Cultural Resources Technical Report- Confidential Attachment Q10: Email Receipt for Cultural Resources Survey Map Book Attachment Q10: Cultural Resource Survey Results from Gap Analysis- Confidential Attachment Q12: Appendix 1- Confidential Attachment Q12: Appendix 2- Confidential Attachment Q14: Appendix 1- Confidential Attachment Q15: Appendix 1- Confidential Attachment Q15: Appendix 2: Confidential Attachment Q18: Cape Short Circuit Duty Calculations- Confidential Attachment Q19: Strip Map of Hybrid Route Attachment Q19: Map Definitions Attachment Q19: GIS Map Package- Confidential SCE Data Request 2 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QPD-1: Email attachment Attachment QPD-3: Map of Location 5 Attachment QPD-3: GIS Map Package- Confidential Attachment QPD-10: Jurupa Valley Ordinance No. 2011-07 Attachment QPD-10: Proposed ROWs Attachment QPD-10: 1948 ROW Grant from Anza Realty Co. Attachment QPD-10: 1948 ROW Grant from Agnes and Samuel Rindge Attachment QPD-10: 1969 Easement Grant from Dewer Co. Attachment QPD-10:GIS Map Package- Confidential Attachment QAR-1: Public Outreach 1 of 5 Attachment QAR-1: Public Outreach 2 of 5 Attachment QAR-1: Public Outreach 3 of 5 Attachment QAR-1: Public Outreach 4 of 5 Attachment QAR-1: Public Outreach 5 of 5 Attachment QAQ-1: Air Quality Calculations Attachment QCUL-1: Cultual GIS Survey Information- Confidential Attachment QNO-1: GIS Map Package- Confidential Attachment QTR-1: Traffic Impact Study Attachment QTR-3: Traffic Estimates Attachment QALT-1: SCE's Transmission Sources SCE Data Request 3 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment Q2.0: Project Description Attachment Attachment Q2.0: GIS- Confidential Attachment Q2.0: Data Dictionary SCE Data Request 4 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QALT-1: EMF Underground Analysis SCE Data Request 5 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QPD-1: Construction Schedule Attachment QPD-2: Conduit Bank Requirements Attachment QAS-1: Viewpoint Location Map Attachment QAS-2: Visual Simulation 1 of 4 Attachment QAS-2: Visual Simulation 2 of 4 Attachment QAS-2: Visual Simulation 3 of 4 Attachment QAS-2: Visual Simulation 4 of 4 Attachment QBIO-1: Jurisdictional Delineation Report Attachment QNO-1: Locations for Corona Noise Measurements SCE Data Request 6 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QALT1: GIS- Confidential Attachment QALT1: Alternative 1 Mapbook Attachment QALT1: Alternative 2 Mapbook Attachment QALT1: Alternative 3 Mapbook Attachment QALT1: Alternative 4 Mapbook SCE Data Request 7 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QPD-2: Project Schedule Attachment QNO-1: Power Flow Data Attachment QNO-2: Noise Technical Report Attachment QTR-1: Synchro Files- Confidential SCE Data Request 9 ResponseAttachment
numbers correspond to the Data Request question number.
Attachment QPD-1: Detailed Comparison Table Attachment QPD-2: Project Description Table SCE Data Request 10 ResponseAttachment
numbers correspond to the Data Request question number. Attachment QALT-1: Alternative 4 Underground Alignment Map Attachment QALT-1: Alternative 4 GIS- Confidential Attachment QALT-1: Alternative 4 Data Dictionary SCE Data Request 11 ResponseAttachment 1: Second Year Survey Report for Delhi Flower Loving Fly Attachment 2: Second Year Survey for Delhi Flower Loving Fly GIS- Confidential CPUC Data Request 12Attachment 1: Air Quality Calculation Spreadsheets SCE Data Request 12 ResponseAttachment
numbers correspond to the Data Request question number. Attachment Q.Air-1: Equipment Use Notification 1 Attachment Q.Air-1: Equipment Use Notification 2 |
|
Additional Attachments |
|
Lennar Homes of California, Inc. ResponseAttachment A:
Development
Planning and Financing Group Memo Rutan & Tucker LLP ResponseResponse 1a Exhibits
Exhibit A: Approved (VMAC) Site Plan Exhibit B: SCE RTRP/VMAC Overlay Exhibit C: VMAC Site Plan with RTRP Right of Way Exhibit D: Line J Diagram Exhibit E: SCE Right of Way Constraints and Guidelines Exhibit F: Excerpts from SCE and RTRP Siting Reports Exhibit G: Webb Engineering Analysis of RTRP/VMAC Conflict Exhibit H: Letter from Western National Group Response 1b Exhibits Exhibit A: October 27, 2015 Request for Information Exhibit B: Thomas G. Merrell Letter of August 20, 2015 (Excerpts) Exhibit C: Summary of Development under SP 266 Exhibit D: Phase B/VMAC Integrated Development and Grading Concept Exhibit E: Road and Utility Easement Exhibit F: Secondary Access Easement Exhibit G: SCE "Constraints and Guidelines" Exhibit H: On-Site Access Constraint diagram Exhibit I: Line J on Phase B Property Diagram Exhibit J: Engineering Constraint Summary Memo Response 1c Exhibits Exhibit A: CPUC Data Request for October 27, 2015 Exhibit B: August 20, 2015 Letter from Thomas Merrill Exhibit C: SP 266 Status Memo Exhibit D: Aerial Photograph of SP 266 Area Exhibit E: Excerpts-Jurupa Valley 8-28-15 response to Information Request Exhibit F: PA 13 Site Lot Line Adjustment Diagram Exhibit G: PA 13 Map in Relation to Harvest Villages Exhibit H: PA 13 Engineered Lot Plan- with RTRP Alignment Exhibit I: Webb Engineering Lot Plan- with RTRP Alignment Exhibit J: SCE's Transmission Line Rights of Way Constraints and Guidelines Exhibit K: City Economic/Fiscal Impact Analysis Response 1d Exhibits Exhibit A: CPUC Data Request of October 27, 2015 Exhibit B: August 20, 2015 Letter from Thomas Merril Exhibit C: Sumarry of Progress of Development Within SP 266 Exhibit D: Aerial Photograph of SP 266 Area Exhibit E: Excerpts-Jurupa Valley 8-28-15 response to Information Request Exhibit F: Lot Line Adjustment Diagram Exhibit G: RTRP Conflict with SKE Site Analysis Exhibit H Webb Engineering SKE Site Analysis Exhibit I: SCE's Transmission Line Right of Way Constraints and Guidelines Exhibit J: SCE Reply Brief dated February 16, 2016 Exhibit K: RPU Reply Brief dated February 16, 2016 Exhibit L: City Economic/Fiscal Impact Analysis Exhibit M: City Economic/Fiscal Impact Analysis (excerpts) |
|
|
|