CPUC Seal


STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

PUC> Energy > California Environmental Quality Act > Current Projects

Southern California Edison's
Riverside Transmission Reliability Project

NOTE:Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Readerif it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

 

      

Data Response Attachments


Please note: Attachment files can be very large and may take a few minutes to load.

SCE Deficiency Report 1 Response

Response 1a Attachments
Attachment 1: SCE's Instructions to Obtain Response to Deficiency Report
Attachment 2: Notice of Availability of Response to Deficiency Report and Certificate of Service
Response 1b Attachments are renumbered below to correspond to the Deficiency Request question number.
Attachment DR1: a) List and Map of Approved Projects  b) IS/MND Riverbend, Master Case 1201  c) IS/MND Vernola Marketplace Apartments, Master Application 1485 
Attachment DR2: a) List and Map of Approved Projects (Same as Attachment DR1 above)  b) SCE Visual Simulations
Attachment DR3: a) Siting Report - Alternative Segment Re-route Feasibility Study  b) Underground Alternatives Desktop Study
Supplemental Response Attachments
Attachment 1: RTRP Preliminary Estimated Cost Comparison of Underground Alternatives Desktop Study
Attachment 2: Underground Alternative Routes Desktop Study and Certificate of Service

SCE Deficiency Report 2 Response


Attachment numbers correspond to the Deficiency Request question number.
Attachment DR1: Preliminary Engineering and Detailed Route Maps
Attachment DR 2: Noise Technical Report (March 2016) -- Updated by Noise Technical Report on 8/8/2017
Attachment DR 3: Aesthetics and Visual Resources Technical Report
Attachment DR3: Revised Aesthetics and Visual Resources Technical Report
Attachment DR 5: Mapped Locations and GIS Data for New Utility Lines--Confidential
Attachment DR7: AECOM's Summary of Archaeological and Built Environment Resources Records --Confidential
Attachment DR8: SCE's Hazardous Materials Database Records
Attachment DR9: a) Emissions Calculations b) Modeling Output Files c) Technical Memo
Attachment DR10: Maps
Attachment DR13: GIS Data
Attachment DR18: Project Approval by CAISO per Administrative Record Document No. 167
Attachment DR19: SCE 2006-2027 Transmission Expansion Plan--Confidential

SCE Deficiency Report 3 Response


Attachment numbers correspond to the Deficiency Request question number.
Attachment DR2: SCE Vista 66 kV Operating Diagram--Confidential
Attachment DR4: 2015 Peak Loading from the SCE Vista 66 kV substation as of 10/22/2015--Confidential
Attachment DR5: Individual Transformer Bank Loading for 220/66 kV transformers at Vista provided in Q4--Confidential
Attachment DR6: Internal Riverside Generation Operating Levels at the time of 2015 peak per Q4--Confidential

SCE Revised Deficiency Report 4 Response


Attachment numbers correspond to the Deficiency Report question number.
Attachment DR1: GIS Map Book Hybrid Route
Attachment DR1: Data Dictionary
Attachment DR2: GIS Map Book Access Roads
Attachment DR2: Data Dictionary
Attachment DR3: Data Dictionary
Attachment DR3: GIS Map Book Hybrid Route Construction Areas
Attachment DR4: Land Disturbance Table
Attachment DR5:  Conceptual Draft Double Circuit 220 kv Duct Bank
Attachment DR6: Cultural Resource Survey Results- Confidential
Attachment DR8: Focused Survey Report
Attachment DR8: Habitat Letter Report
Attachment DR8: Underground Habitat Assessment
Attachment DR8: Remaining Survey Schedule
Attachment DR8: Rare Plants Survey Spring 2017
Attachment DR9: RTRP Hybrid Schedule
Attachment DR10: Equipment and Workforce Estimates
Attachment DR12: Conceptual Draft Double Circuit 220 kv Duct Bank
Attachment DR12: Alternatives Desktop Study
Attachment DR13: Design of Riser Poles
Attachment DR14: Cross Section of Underground Vault
Attachment DR14: Cross Section of Telecommunications Manhole
Attachment DR15: Noise Technical Report and Attachments (November 2016) -- Updated by Noise Technical Report on 8/8/2017
Attachment DR16: Traffic Impact Study
Attachment DR18: Emissions and Air Quality Modeling Results
Attachment DR18: Summary of Revised Unmitigated Emmissions Estimates
Attachment DR19: EMF Analysis for the Underground Segment

 SCE Data Request 1 Response


Attachment numbers correspond to the Data Request question number.
Attachment Q03: Updated Access Roads KMZ- Confidential
Attachment Q06: Focused Survey for Delhi Sands Flower-Loving Fly (2006)  
Attachment Q06: 2006 Delhi Flower Loving Fly Surveys Aerial Photo
Attachment Q06: Species Locations
Attachment Q06: Second Year Focused Survey for Delhi Sands Flower-Loving Fly (2017)
Attachment Q07: Burrowing Owl and Riparian Bird Species Habitat Assessment
Attachment Q08: San Bernadino Kangaroo Rat and Los Angeles Pocket Mouse Survey
Attachment Q09: UPS Delivery Receipt Cultural Resources Technical Report
Attachment Q09: Appendix A- Confidential
Attachment Q09: Appendix B- Confidential
Attachment Q09: Appendix C- Confidential
Attachment Q09: Cultural Resources Technical Report- Confidential
Attachment Q10: Email Receipt for Cultural Resources Survey Map Book
Attachment Q10: Cultural Resource Survey Results from Gap Analysis- Confidential
Attachment Q12: Appendix 1- Confidential
Attachment Q12: Appendix 2- Confidential
Attachment Q14: Appendix 1- Confidential
Attachment Q15: Appendix 1- Confidential
Attachment Q15: Appendix 2: Confidential
Attachment Q18: Cape Short Circuit Duty Calculations- Confidential
Attachment Q19: Strip Map of Hybrid Route
Attachment Q19: Map Definitions
Attachment Q19: GIS Map Package- Confidential

 SCE Data Request 2 Response


Attachment numbers correspond to the Data Request question number.
Attachment QPD-1: Email attachment
Attachment QPD-3: Map of Location 5
Attachment QPD-3: GIS Map Package- Confidential
Attachment QPD-10: Jurupa Valley Ordinance No. 2011-07
Attachment QPD-10: Proposed ROWs
Attachment QPD-10: 1948 ROW Grant from Anza Realty Co.
Attachment QPD-10: 1948 ROW Grant from Agnes and Samuel Rindge
Attachment QPD-10: 1969 Easement Grant from Dewer Co.
Attachment QPD-10:GIS Map Package- Confidential
Attachment QAR-1: Public Outreach 1 of 5
Attachment QAR-1: Public Outreach 2 of 5
Attachment QAR-1: Public Outreach 3 of 5
Attachment QAR-1: Public Outreach 4 of 5
Attachment QAR-1: Public Outreach 5 of 5
Attachment QAQ-1: Air Quality Calculations
Attachment QCUL-1: Cultual GIS Survey Information- Confidential
Attachment QNO-1: GIS Map Package- Confidential
Attachment QTR-1: Traffic Impact Study
Attachment QTR-3: Traffic Estimates
Attachment QALT-1: SCE's Transmission Sources

 SCE Data Request 3 Response


Attachment numbers correspond to the Data Request question number.
Attachment Q2.0: Project Description Attachment
Attachment Q2.0: GIS- Confidential
Attachment Q2.0: Data Dictionary

 SCE Data Request 4 Response


Attachment numbers correspond to the Data Request question number.
Attachment QALT-1: EMF Underground Analysis

 SCE Data Request 5 Response

Attachment numbers correspond to the Data Request question number.
Attachment QPD-1: Construction Schedule
Attachment QPD-2: Conduit Bank Requirements
Attachment QAS-1: Viewpoint Location Map
Attachment QAS-2: Visual Simulation 1 of 4
Attachment QAS-2: Visual Simulation 2 of 4
Attachment QAS-2: Visual Simulation 3 of 4
Attachment QAS-2: Visual Simulation 4 of 4
Attachment QBIO-1: Jurisdictional Delineation Report
Attachment QNO-1: Locations for Corona Noise Measurements

 SCE Data Request 6 Response


Attachment numbers correspond to the Data Request question number.
Attachment QALT1: GIS- Confidential
Attachment QALT1: Alternative 1 Mapbook
Attachment QALT1: Alternative 2 Mapbook
Attachment QALT1: Alternative 3 Mapbook
Attachment QALT1: Alternative 4 Mapbook

 SCE Data Request 7 Response


Attachment numbers correspond to the Data Request question number.
Attachment QPD-2: Project Schedule
Attachment QNO-1: Power Flow Data
Attachment QNO-2: Noise Technical Report
Attachment QTR-1: Synchro Files- Confidential

 SCE Data Request 9 Response


Attachment numbers correspond to the Data Request question number.
Attachment QPD-1: Detailed Comparison Table
Attachment QPD-2: Project Description Table


 SCE Data Request 10 Response

Attachment numbers correspond to the Data Request question number.

Attachment QALT-1: Alternative 4 Underground Alignment Map
Attachment QALT-1: Alternative 4 GIS- Confidential
Attachment QALT-1: Alternative 4 Data Dictionary

SCE Data Request 11 Response

Attachment 1: Second Year Survey Report for Delhi Flower Loving Fly
Attachment 2: Second Year Survey for Delhi Flower Loving Fly GIS- Confidential

CPUC Data Request 12

Attachment 1: Air Quality Calculation Spreadsheets

SCE Data Request 12 Response

Attachment numbers correspond to the Data Request question number.

Attachment Q.Air-1: Equipment Use Notification 1
Attachment Q.Air-1: Equipment Use Notification 2



Additional Attachments


Lennar Homes of California, Inc. Response

Attachment A: Development Planning and Financing Group Memo
Attachment B: Tract 36391 Riverbend SCE RTRP Impact Exhibit
Attachment C: 230-kV UG Transmission Line Segment RTRP Project Opinion of Probable Cost
Attachment D: Valuation Services Relative to Residential, Commercial, and Industrial Land Uses in Jurupa Valley
Attachment E: Conceptual Design of Underground System
Attachment F: Overhead vs. Pats Ranch Road Underground Alternative Project Cost Comparison


Rutan & Tucker LLP Response

Response 1a Exhibits
Exhibit A: Approved (VMAC) Site Plan
Exhibit B: SCE RTRP/VMAC Overlay
Exhibit C: VMAC Site Plan with RTRP Right of Way
Exhibit D: Line J Diagram
Exhibit E: SCE Right of Way Constraints and Guidelines
Exhibit F: Excerpts from SCE and RTRP Siting Reports
Exhibit G: Webb Engineering Analysis of RTRP/VMAC Conflict
Exhibit H: Letter from Western National Group
Exhibit I:  Rendering of RTRP Conflict with VMAC Project

Response 1b Exhibits
Exhibit A: October 27, 2015 Request for Information
Exhibit B: Thomas G. Merrell Letter of August 20, 2015 (Excerpts)
Exhibit C: Summary of Development under SP 266
Exhibit D: Phase B/VMAC Integrated Development and Grading Concept
Exhibit E: Road and Utility Easement
Exhibit F: Secondary Access Easement
Exhibit G: SCE "Constraints and Guidelines"
Exhibit H: On-Site Access Constraint diagram
Exhibit I: Line J on Phase B Property Diagram
Exhibit J: Engineering Constraint Summary Memo

Response 1c Exhibits
Exhibit A: CPUC Data Request for October 27, 2015
Exhibit B: August 20, 2015 Letter from Thomas Merrill
Exhibit C: SP 266 Status Memo
Exhibit D: Aerial Photograph of SP 266 Area
Exhibit E: Excerpts-Jurupa Valley 8-28-15 response to Information Request
Exhibit F: PA 13 Site Lot Line Adjustment Diagram
Exhibit G: PA 13 Map in Relation to Harvest Villages
Exhibit H: PA 13 Engineered Lot Plan- with RTRP Alignment
Exhibit I: Webb Engineering Lot Plan- with RTRP Alignment
Exhibit J: SCE's Transmission Line Rights of Way Constraints and Guidelines
Exhibit K: City Economic/Fiscal Impact Analysis

Response 1d Exhibits
Exhibit A: CPUC Data Request of October 27, 2015
Exhibit B: August 20, 2015 Letter from Thomas Merril
Exhibit C: Sumarry of Progress of Development Within SP 266
Exhibit D: Aerial Photograph of SP 266 Area
Exhibit E: Excerpts-Jurupa Valley 8-28-15 response to Information Request
Exhibit F: Lot Line Adjustment Diagram
Exhibit G: RTRP Conflict with SKE Site Analysis
Exhibit H Webb Engineering SKE Site Analysis
Exhibit I: SCE's Transmission Line Right of Way Constraints and Guidelines
Exhibit J: SCE Reply Brief dated February 16, 2016
Exhibit K: RPU Reply Brief dated February 16, 2016
Exhibit L: City Economic/Fiscal Impact Analysis
Exhibit M: City Economic/Fiscal Impact Analysis (excerpts)


Please report any problems to the Energy Division web coordinator.