NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

Data Response Attachments


SDG&E Deficiency Report Response

Attachment numbers correspond to the Deficiency Request question number.
Attachment DR 1: GIS Files--Confidential.
Attachment DR 7: GIS Files--Confidential.
Attachment DR 8: Substation Profiles--Confidential.
Attachment DR 11: Manpower and Equipment
< br> Attachment DR 12: Preliminary Draft Fire Plan
Attachment DR 14: a) Table 14-1 KOP Photograph Data   b) KOP GIS Shapefiles
Attachment DR 15: Marker Ball Spans
Attachment DR 16: Angle Structures
Attachment DR 17 - 21: Air Quality Tables
Attachment DR 22: Spring Rare Plants
Attachment DR 23: Access Road GIS--Confidential.
Attachment DR 25: Cultural Resources Reports--Confidential.
Attachment DR 26: Cultural Resources Reports--Confidential.
Attachment DR 27: a) Geotechnical Reports 230 kV San Onofre to Escondido February 1972 and b)  April 1972   c) Geotechnical Reports--Confidential.
Attachment DR 31: Drainage Crossing Map
Attachment DR 37: Example Traffic Control Plans
Attachment DR 38: Construction Traffic

SDG&E Data Response 1 

Attachment numbers correspond to the Data Request question number.
Attachment DR 2: Retaining Wall GIS Files--Confidential.
Attachment DR 3: Pole Removal GIS Files--Confidential.
Attachment DR 4 and 57: a) Segment B Alignment and Work Limits   b) GIS Files--Confidential.
Attachment DR 6: Access Road GIS Files--Confidential.
Attachment DR 7: Revised Staging Yards GIS Files--Confidential.
Attachment DR 10: Encina Tap
Attachment DR 19: Alternate Cable Pole Map, GIS Files--Confidential.
Attachment DR 21: Original KOP Photos and Simulations 
Attachment DR 24 - 26: Air Quality Tables
Attachment DR 34: Cultural Survey GIS Files--Confidential.
Attachment DR 37: Soils Table
Attachment DR 48: Trails Map
Attachment DR 54: a) Speed Limit Map   b) Traffic Data Dates
Attachment DR 63: Letter from City of San Diego's Public Utilities Department

SDG&E Data Response 2 

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Chicarita South Property Owner Letter   b) Torrey Santa Fe Aerial Photo   c) Stowe Property Owner Letter
Attachment DR 4: Various Foundation Photos
Attachment DR 5: Bundled 230 KV Photos
Attachment DR 6: a) Typical 138kV TSP   b) Typical 230 kV Splice Vault   c) 69kV Single Circuit Cable Pole
Attachment DR 7: Topped Pole Photo
Attachment DR 9: a) Substation Details    b) Substation Diagram--Confidential.
Attachment DR 14: Vendura Retaining Wall Photo
Attachment DR 15: Works Areas GIS Files--Confidential.
Attachment DR 19: Project Features GIS Files--Confidential.
Attachment DR 22: Letter from City of San Diego's Public Utilities Department (Same as Attachment DR 63 above)
Attachment DR 25: Pole Locations GIS Files--Confidential.
Attachment DR 89: KOP Photos and Visual Simulations (Same as Attachment DR 21 above)
Attachment DR 102: a) New Biological Survey Areas Memo   b) GIS Files--Confidential.
Attachment DR 103: Quino Checkerspot Butterfly Memo
Attachment DR 104: Burrowing Owl Memo
Attachment DR 105: Thread-leaved Brodiaea Memo
Attachment DR 106: Willowy Monardella Memo
Attachment DR 107: Orcutt Grass Memo
Attachment DR 108: Road Ruts GIS Files--Confidential.
Attachment DR 109: Cultural Resources Survey Report--Confidential.
Project Refinement Report--Confidential.

SDG&E Data Response 3

Attachment numbers correspond to the Data Request question number.
Attachment DR 3: Topped and Pole Removal GIS
Attachment DR 6: SDG&E BMP Manual
Attachment DR 8: Access Road GIS--Confidential.
Attachment DR 11: Existing Magnetic Field Results
Attachment DR 13: a) Topped Pole Tables   b) Steel H-Frame Diagram
Attachment DR 14: Structure 154 GIS
Attachment DR 15: Work Area GIS--Confidential.
Attachment DR 17: P3 Diagram
Attachment DR 19: a) Encina Hub--Confidential.   b) Structure GIS
Attachment DR 21: a) ADSS Exhibits   b) Segment D Refinement Table
Attachment DR 22: a) Emissions Spreadsheets   b) Revised Emissions Tables
Attachment DR 26: a) Vegetation Survey Memo   b) Biology GIS
Attachment DR 27: a) Quino Checkerspot Butterfly Memo   b) Quino Checkerspot Butterfly GIS
Attachment DR 28: a) Focused Burrowing Owl Habitat Assessment   b) Figure 1   c) Figure 2   d) Figure 3   e) Figure 4
Attachment DR 29: BroFil GIS
Attachment DR 30: Jurisdictional Delineation GIS
Attachment DR 31: a) Archaeological Survey Report--Confidential.   b) Archaeological GIS--Confidential.
Attachment DR 32: SDI-14131 Evaluation Results--Confidential.
Attachment DR 33: Landscape Assessment--Confidential.
Attachment DR 34: a) SDG&E's 2014 Fire Prevention Plan   b) SDG&E's Electric Standard Practice 113.1
Attachment DR 35: a) Figures of Original Noise Measurement Locations   b) Noise Measurement Tables   c) 24-hour Raw Data   d) New Survey Locations GIS
Attachment DR 36: Carmel Valley Road Traffic Study

SDG&E Data Response 4

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) MCAS Miramar Easement   b) MCAS Miramar Easement GIS--Confidential.
Attachment DR 2: a) MCAS Miramar Letter dated November 11, 2013   b) MCAS Miramar Letter dated March 5, 2014   c) Contacts at MCAS Miramar

SDG&E Data Response 5

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Draft EIR Project Description   b) Trench Diagram   c) Map Comments   d) GIS Data
Attachment DR 4: Helicopter Use Plan
Attachment DR 5: Evergreen Nursery Email   a) Archaeological Survey Report--Confidential.   b) Biological Resources Survey   c) Vegetation Data GIS
Attachment DR 8: California Department of Parks and Recreation Forms--Confidential.
Attachment DR 9: a) Replacement Tables   b) Construction Emissions
Attachment DR 10: SX-PQ Carmel Valley Road Traffic Impact Study
Attachment DR 11: a) Cumulative Project List Table   b) Cumulative Project GIS--Confidential. UPDATED: a) Cumulative Project List Table   b) Cumulative Project GIS--Confidential.
Attachment DR 12: Radius Map

SDG&E Data Response 6

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Rare Plant GIS

SDG&E Data Response 7

Attachment numbers correspond to the Data Request question number.
Attachment DR 1:  138kV Steel H-Frame Typical Diagram
Attachment DR 2:  Burrowing Owl GIS--Confidential.
Attachment DR 3:  Rare Plant GIS--Confidential.
Attachment DR 4:  Revised Air Quality Emissions Tables
Attachment DR 6:  Additional Work Area GIS--Confidential.
Attachment DR 7:  DPR Forms-Confidential.
Attachment DR 8:  Supplemental Analysis-Confidential.
Attachment DR 9:  Survey Schedule
Attachment DR 10: Draft EIR Project Description Text

SDG&E Data Response 8

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Contingency File 2017--Confidential.   b) Contingency File 2019--Confidential.
Attachment DR 3: a) Mercy Road Underground Design   b) Pending   c) Pole Work Data   d) Typical Underground Work Area   e) Typical Duct Bank Dimensions   f) Design Assumptions   g) Underground Design GIS  
Attachment DR 4: Stonebridge-Mira Mesa Combined Underground Design
Attachment DR 5: Pomerado-Miramar North Underground Design
Attachment DR 6: Pomerado-Miramar Combined Underground Design
Attachment DR 7: Segment D 69kV Partial Underground
Attachment DR 8: a) Relocation Pole Detail Table   b) GIS Data
Attachment DR 9: a) Preliminary Underground Alignment   b) GIS Data

SDG&E Data Response 9

Attachment numbers correspond to the Data Request question number.
Attachment DR 2: a) Encina Hub JD Memo  b) GIS Data  c) JD Memo  d) GIS Data
Attachment DR 4: a) Burrowing Owl Memorandum at Encina Hub   b) Burrowing Owl Memorandum at Staging Yards
Attachment DR 6: a) Biological Survey Letter   b) Cultural Survey Letter--Confidential.   c) Site Records--Confidential.   d) Vegetation GIS

SDG&E Data Response 10

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Input Tables    b) Magnetic Field Calculations for Alternatives   c) Summary of Calculated Values for Proposed Project
Attachment DR 2: a) Segment B UG Utilities GIS    b) Segment B Detail Map  
Attachment DR 3: a) SDGE Gas and Dist. GIS--Confidential.  b) SDGE Gas and Dist. Map--Confidential.  c) Non-SDGE UG Utility GIS
Attachment DR 4: Overview Map and Cross Sections
Attachment DR 6: a) Existing Aerial Marking  b) Lighting Standards and Specifications
Attachment DR 7: Alternatives Overview Map
Attachment DR 8: I-15 Structure Map
Attachment DR 11: a) CA-SDI-13082 and 12123--Confidential.  b) SR-56 Report--Confidential.  c) SDI-13082 Update--Confidential.  d) SDI-14123 Update--Confidential.  e) SDI-13082 and CA-SDI-14123 GIS--Confidential.
Attachment DR 12: SDI-18277 Evaluation Results--Confidential.
Attachment DR 13: a) Work Impact Areas GIS  b) DEIR Table 2.4-1 Revised

SDG&E Data Response 11

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Cable Pole Table
Attachment DR 2: a) Rare Plant Survey Report  b) GIS Data  c) Rare Plant Survey Update Memo  d) Updated Rare Plant GIS

SDG&E Data Response 12

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) P41A Work Area Map  b) P41A Preliminary Design  c) GIS Data  d) P41A Simulations
Attachment DR 2: South of CVR Alternative Work Area Map
Attachment DR 3: BMR UG Work Areas Map
Attachment DR 4: Cable Pole Fence Location
Attachment DR 6: a) Access Map  b) Easement Excerpt
Attachment DR 7: Agency Stakeholder Interaction Details
Attachment DR 8: Existing Utilities GIS - Segment B

SDG&E Data Response 13

Attachment numbers correspond to the Data Request question number.
Attachment DR 4: Emissions Spreadsheets

SDG&E Data Response 14

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Cross Sections
Attachment DR 2: CAISO Correspondence
Attachment DR 3: Easement
Attachment DR 4: Sycamore to Mission Cross Sections
Attachment DR 6: a) Kilroy  b) Poway Unified Property and Potential Staging Area  c) Biological Survey  d) Archaeological Survey Report--Confidential.  e) Poway Unified School District Permission Letter
Attachment DR 7: Peñasquitos Junction to Peñasquitos Substation Cross Sections
Attachment DR 8: Peñasquitos Junction to Peñasquitos Substation (Mission to Peñasquitos Proposed) Cross Sections

SDG&E Data Response 15

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Mission to Sycamore Cross Section  b) Mission to Sycamore Revised Cross Sections

SDG&E Data Response 16

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Mission to Peñasquitos Cross Sections
Attachment DR 3: a) H-Frame GIS Data  b) H-Frame Structure Map
Attachment DR 4: a) Revised Work Areas GIS Data  b) Changes to Project Description  c) Impact Revision Mapbook
Attachment DR 5: a) CVR Staging Yard GIS Data  b) CVR Staging Yard Survey Memo
Attachment DR 6: Archaeological Survey Report--Confidential.

SDG&E Data Response 17

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Mission to Sycamore Cross Sections
Attachment DR 3: Mission to San Luis Rey Cross Sections
Attachment DR 5.3: Revised Work Areas GIS Data  
Attachment DR 5.4: Revised Vegetation Mapping Memo
Attachment DR 6: a) H-Frame Overview Map  b) H-Frame Photos  c) H-Frame Removal Work Areas GIS Data
Attachment DR 7: a) CVR Yard Delineation Memo  b) Vegetation Mapping GIS Data

SDG&E Data Response 18

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Least Bell's Vireo Focused Survey Report for the Main Alignment  b) Least Bell's Vireo Focused Survey Report for Encina Hub  c) Coastal California Gnatcatcher Focused Survey Report for the Main Alignment  d) Coastal California Gnatcatcher Focused Survey Report for Encina Hub  e) Burrowing Owl Focused Survey Report for the Main Alignment  f) Southwestern Willow Flycatcher Focused Survey Report for the Main Alignment  g) California Orcutt Grass Focused Survey Memo for the Main Alignment  h) Thread-Leaved Brodiaea Focused Survey Memo for the Main Alignment  i) Southwestern Willow Flycatcher Focused Survey Report for Encina Hub  j) Burrowing Owl Focused Survey Report for Encina Hub  k) Light-Footed Ridgway's Rail Focused Survey Memo for Encina Hub  l) Least Bell's Vireo Focused Survey Report for Alternative 4  m) Coastal California Gnatcher Focused Survey Report for Alternative 4  n) Updated Special-Status Plant Species Survey Report for Alternatives 2a and 2b
Attachment DR 6: Clearance Check Output Table
Attachment DR 7: Alternative Route 5 Segment C Proposed Overhead and Buried Steeel Pipes Map--Confidential.
Attachment DR 8: Pomerado Bridge Crossing

SDG&E Data Response 19

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Revised Magnetic Field Calculations from DR 10 
Attachment DR 2: a) Thread-Leaved Brodiaea GIS Data  b)  Alternative 2 Rare Plants GIS Data 

SDG&E Data Response 20

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) 2016 Meeting Minutes  b) 2015 Meeting Summary
Attachment DR 2: Proposed Project Catenary Span Review
Attachment DR 5: Traffic Information Memo

SDG&E Data Response 22

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: a) Alternative 5 Staging Yards Maps  b) Alternative 5 Staging Yards Photos  c) Carmel Mountain Road Bridge Cells Memo
Attachment DR 1 (Part 2): a) Revised Alternative 5 Staging Yards Maps  b) Alternative 5 Staging Yard 4 Photos  c) Alternative 5 Staging Yards GIS
Attachment DR 2: a) SX-PQ Transmission Line Traffic Study Response Explanations  b) Revised Traffic Information Memo

SDG&E Data Response 23

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Magnetic Field Management Plan for Alternative Routes in the Final EIR


SDG&E PFM Data Response 1

Attachment numbers correspond to the Data Request question number.
Attachment DR 1: Part 1) GIS Shapefile Package for Mapbook Features Part 2) GIS shapefiles for Cultural Survey Limits


This page contains tables and is best viewed with Netscape or Internet Explorer. Please report any problems to the Energy Division web coordinator.